18. Common Mistakes & Failure Modes · 第 1/7 頁
Mistake: Long SPD Leads
The number-one field killer of performance.

Symptom
Equipment still fails despite "SPD installed."
Cause
1–2 m coiled leads adding inductive voltage.
Fix
Relocate SPD or rebuild connections short and straight; verify PE landing.
